SR 1130/MODLIN Rd. over Nc 11
GoodHertford County, North Carolina · 0.3 Miles W. SR 1215 · Structure no. 000000000910155
- Built
- 2020
- 5 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 186 ft
- 2 main spans
- Daily traffic
- 1,200
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR 1130/MODLIN Rd. over Nc 11 is a prestressed concrete stringer/multi-beam or girder carrying SR 1130/MODLIN Rd. over Nc 11 in Hertford County, North Carolina. It was built in 2020, so it is 5 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,200 vehicles a day, roughly 6% of them trucks, projected to reach 2,400 by 2040. The structure is 186 ft (56.6 m) long and 33 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 1130/MODLIN Rd. over Nc 11 built?
It was built in 2020, making it 5 years old in 2025.
What condition is SR 1130/MODLIN Rd. over Nc 11 in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does SR 1130/MODLIN Rd. over Nc 11 carry?
About 1,200 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR 1130/MODLIN Rd. over Nc 11?
The structure is 186 ft (56.6 m) long with a longest span of 90 ft (27.4 m) and a deck 33 ft wide.
Who owns SR 1130/MODLIN Rd. over Nc 11?
It is owned by the State Highway Agency.