US Bridges

Blue Ridge Parkway over U.S. Route 23/74 & South

Fair

Haywood County, North Carolina · 10.9 Miles to Nc Route 21 · Structure no. 5140127P0000000

Built
1963
62 years old, rebuilt 1995
Condition
Fair
inspected July 2023
Type
Box Beam or Girders - Single or Spread
Concrete Continuous
Length
284 ft
4 main spans
Daily traffic
1,878
2013 count
Owner
Federal
National Park Service

About this bridge

Blue Ridge Parkway over U.S. Route 23/74 & South is a concrete continuous box beam or girders - single or spread carrying Blue Ridge Parkway over U.S. Route 23/74 & South in Haywood County, North Carolina. It was built in 1963 and reconstructed in 1995, so it is 62 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,878 vehicles a day, roughly 18% of them trucks, projected to reach 2,066 by 2033. The structure is 284 ft (86.5 m) long and 33 ft wide. If it were closed, the detour would be 44.7 mi (72 km).

CarriesBlue Ridge Parkway
CrossesU.S. Route 23/74 & South
Location10.9 Miles to Nc Route 21
RouteFederal Lands Road 1
Coordinates35.43432, -83.07825
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating32.6 US tons
Inventory rating19.5 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length284 ft (86.5 m)
Longest span71 ft (21.6 m)
Deck width33 ft (10.1 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,878 (2013)
Projected traffic2,066 by 2033
Trucks18%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway and railroad
Detour if closed44.7 mi (72 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerNational Park Service
Maintained byNational Park Service
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$8,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Blue Ridge Parkway over U.S. Route 23/74 & South built?

It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1995.

What condition is Blue Ridge Parkway over U.S. Route 23/74 & South in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Blue Ridge Parkway over U.S. Route 23/74 & South carry?

About 1,878 vehicles per day (2013 count), of which roughly 18% are trucks.

How long is Blue Ridge Parkway over U.S. Route 23/74 & South?

The structure is 284 ft (86.5 m) long with a longest span of 71 ft (21.6 m) and a deck 33 ft wide.

Who owns Blue Ridge Parkway over U.S. Route 23/74 & South?

It is owned by the National Park Service.