SR1608 over Ut to N.Hominy Creek
GoodHaywood County, North Carolina · .05 MI.N.JCT.SR1606 · Structure no. 000000000870026
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected May 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 52 ft
- 1 main span
- Daily traffic
- 700
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SR1608 over Ut to N.Hominy Creek is a prestressed concrete slab carrying SR1608 over Ut to N.Hominy Creek in Haywood County, North Carolina. It was built in 2022, so it is 3 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 700 vehicles a day, roughly 6% of them trucks, projected to reach 1,400 by 2040. The structure is 52 ft (15.8 m) long and 30 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR1608 over Ut to N.Hominy Creek built?
It was built in 2022, making it 3 years old in 2025.
What condition is SR1608 over Ut to N.Hominy Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does SR1608 over Ut to N.Hominy Creek carry?
About 700 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is SR1608 over Ut to N.Hominy Creek?
The structure is 52 ft (15.8 m) long with a longest span of 49 ft (14.9 m) and a deck 30 ft wide.
Who owns SR1608 over Ut to N.Hominy Creek?
It is owned by the State Highway Agency.