US Bridges

I-40E over I73 US421

Good

Guilford County, North Carolina · 0.5 Mi. E. Jct. SR1554 · Structure no. 000000000810828

Built
2005
20 years old
Condition
Good
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
269 ft
2 main spans
Daily traffic
46,500
2020 count
Owner
State
State Highway Agency

About this bridge

I-40E over I73 US421 is a steel continuous stringer/multi-beam or girder carrying I-40E over I73 US421 in Guilford County, North Carolina. It was built in 2005, so it is 20 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 46,500 vehicles a day, roughly 16% of them trucks, projected to reach 93,000 by 2040. The structure is 269 ft (81.9 m) long and 82 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI-40E
CrossesI73 US421
Location0.5 Mi. E. Jct. SR1554
RouteInterstate 40
Coordinates36.06592, -79.92119
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88 US tons
Inventory rating52.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length269 ft (81.9 m)
Longest span148 ft (45.1 m)
Deck width82 ft (25.1 m)
Roadway width80 ft (24.3 m)
Vertical clearance over deck18 ft (5.4 m)

Traffic and service

Average daily traffic46,500 (2020)
Projected traffic93,000 by 2040
Trucks16%
Lanes on structure4
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-40E over I73 US421 built?

It was built in 2005, making it 20 years old in 2025.

What condition is I-40E over I73 US421 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does I-40E over I73 US421 carry?

About 46,500 vehicles per day (2020 count), of which roughly 16% are trucks.

How long is I-40E over I73 US421?

The structure is 269 ft (81.9 m) long with a longest span of 148 ft (45.1 m) and a deck 82 ft wide.

Who owns I-40E over I73 US421?

It is owned by the State Highway Agency.