Benjamin Parkway over W Wendover AVE/US70/220
PoorGuilford County, North Carolina · 0.14 Mi. S. Jct. SR2175 · Structure no. 000000000810469
- Built
- 1968
- 57 years old
- Condition
- Poor
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 173 ft
- 4 main spans
- Daily traffic
- 15,000
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Benjamin Parkway over W Wendover AVE/US70/220 is a steel stringer/multi-beam or girder carrying Benjamin Parkway over W Wendover AVE/US70/220 in Guilford County, North Carolina. It was built in 1968, so it is 57 years old, older than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: open, would be posted or closed except for temporary shoring.
It carries about 15,000 vehicles a day, roughly 12% of them trucks, projected to reach 30,000 by 2040. The structure is 173 ft (52.7 m) long and 95 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Benjamin Parkway over W Wendover AVE/US70/220 built?
It was built in 1968, making it 57 years old in 2025.
What condition is Benjamin Parkway over W Wendover AVE/US70/220 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2024.
How much traffic does Benjamin Parkway over W Wendover AVE/US70/220 carry?
About 15,000 vehicles per day (2021 count), of which roughly 12% are trucks.
How long is Benjamin Parkway over W Wendover AVE/US70/220?
The structure is 173 ft (52.7 m) long with a longest span of 54 ft (16.4 m) and a deck 95 ft wide.
Who owns Benjamin Parkway over W Wendover AVE/US70/220?
It is owned by the City or Municipal Highway Agency.