US Bridges

NC96 over I85

Fair

Granville County, North Carolina · 0.3 MI S JCT SR1646 · Structure no. 000000000770044

Built
1970
55 years old
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
269 ft
4 main spans
Daily traffic
14,000
2022 count
Owner
State
State Highway Agency

About this bridge

NC96 over I85 is a steel continuous stringer/multi-beam or girder carrying NC96 over I85 in Granville County, North Carolina. It was built in 1970, so it is 55 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 14,000 vehicles a day, roughly 6% of them trucks, projected to reach 28,000 by 2040. The structure is 269 ft (81.9 m) long and 65 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesNC96
CrossesI85
Location0.3 MI S JCT SR1646
RouteState Highway 96
Coordinates36.29579, -78.57995
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating67.9 US tons
Inventory rating40.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length269 ft (81.9 m)
Longest span90 ft (27.4 m)
Deck width65 ft (19.9 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic14,000 (2022)
Projected traffic28,000 by 2040
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was NC96 over I85 built?

It was built in 1970, making it 55 years old in 2025.

What condition is NC96 over I85 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does NC96 over I85 carry?

About 14,000 vehicles per day (2022 count), of which roughly 6% are trucks.

How long is NC96 over I85?

The structure is 269 ft (81.9 m) long with a longest span of 90 ft (27.4 m) and a deck 65 ft wide.

Who owns NC96 over I85?

It is owned by the State Highway Agency.