US Bridges

Access to School over Cheoah River

Good

Graham County, North Carolina · 0.2MI.E.OF Jct.With US129 · Structure no. 000000000750146

Built
2019
6 years old
Condition
Good
inspected July 2023
Type
Slab
Prestressed Concrete
Length
223 ft
3 main spans
Daily traffic
100
2017 count
Owner
State
State Highway Agency

About this bridge

Access to School over Cheoah River is a prestressed concrete slab carrying Access to School over Cheoah River in Graham County, North Carolina. It was built in 2019, so it is 6 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 7% of them trucks, projected to reach 200 by 2040. The structure is 223 ft (67.9 m) long and 48 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesAccess to School
CrossesCheoah River
Location0.2MI.E.OF Jct.With US129
Coordinates35.32785, -83.80232
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating44 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHL 93
Structure length223 ft (67.9 m)
Longest span88 ft (26.8 m)
Deck width48 ft (14.6 m)
Roadway width34 ft (10.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2017)
Projected traffic200 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Access to School over Cheoah River built?

It was built in 2019, making it 6 years old in 2025.

What condition is Access to School over Cheoah River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Access to School over Cheoah River carry?

About 100 vehicles per day (2017 count), of which roughly 7% are trucks.

How long is Access to School over Cheoah River?

The structure is 223 ft (67.9 m) long with a longest span of 88 ft (26.8 m) and a deck 48 ft wide.

Who owns Access to School over Cheoah River?

It is owned by the State Highway Agency.