US Bridges

US421 to I74 Ramp over Smith Creek

Good

Forsyth County, North Carolina · 0.2 Mi.N. JCT.US421N.RAMP · Structure no. 000000000670673

Built
2020
5 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
310 ft
3 main spans
Daily traffic
350
2022 count
Owner
State
State Highway Agency

About this bridge

US421 to I74 Ramp over Smith Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying US421 to I74 Ramp over Smith Creek in Forsyth County, North Carolina. It was built in 2020, so it is 5 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, roughly 16% of them trucks, projected to reach 700 by 2040. The structure is 310 ft (94.4 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesUS421 to I74 Ramp
CrossesSmith Creek
Location0.2 Mi.N. JCT.US421N.RAMP
RouteInterstate 74
Coordinates36.11651, -80.12923
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.9 US tons
Inventory rating54.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadH 10
Structure length310 ft (94.4 m)
Longest span117 ft (35.6 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2022)
Projected traffic700 by 2040
Trucks16%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US421 to I74 Ramp over Smith Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is US421 to I74 Ramp over Smith Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does US421 to I74 Ramp over Smith Creek carry?

About 350 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is US421 to I74 Ramp over Smith Creek?

The structure is 310 ft (94.4 m) long with a longest span of 117 ft (35.6 m) and a deck 33 ft wide.

Who owns US421 to I74 Ramp over Smith Creek?

It is owned by the State Highway Agency.