US Bridges

SR 2385 over I-74

Good

Forsyth County, North Carolina · 0.8M. S. Jct. SR2407 · Structure no. 000000000670667

Built
2016
9 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
229 ft
2 main spans
Daily traffic
3,400
2021 count
Owner
State
State Highway Agency

About this bridge

SR 2385 over I-74 is a prestressed concrete stringer/multi-beam or girder carrying SR 2385 over I-74 in Forsyth County, North Carolina. It was built in 2016, so it is 9 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,400 vehicles a day, roughly 7% of them trucks, projected to reach 6,800 by 2040. The structure is 229 ft (69.8 m) long and 38 ft wide. If it were closed, the detour would be 7.5 mi (12 km).

CarriesSR 2385
CrossesI-74
Location0.8M. S. Jct. SR2407
RouteState Highway 2385
Coordinates36.14109, -80.14675
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating92.9 US tons
Inventory rating56 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length229 ft (69.8 m)
Longest span114 ft (34.7 m)
Deck width38 ft (11.6 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,400 (2021)
Projected traffic6,800 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed7.5 mi (12 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 2385 over I-74 built?

It was built in 2016, making it 9 years old in 2025.

What condition is SR 2385 over I-74 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does SR 2385 over I-74 carry?

About 3,400 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is SR 2385 over I-74?

The structure is 229 ft (69.8 m) long with a longest span of 114 ft (34.7 m) and a deck 38 ft wide.

Who owns SR 2385 over I-74?

It is owned by the State Highway Agency.