US Bridges

I40 Wbl over I74 Ebl US311 Sbl Ramp

Good

Forsyth County, North Carolina · 1.54 Mi. E. Jct. SR4325 · Structure no. 000000000670432

Built
1989
36 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
146 ft
3 main spans
Daily traffic
49,250
2022 count
Owner
State
State Highway Agency

About this bridge

I40 Wbl over I74 Ebl US311 Sbl Ramp is a steel stringer/multi-beam or girder carrying I40 Wbl over I74 Ebl US311 Sbl Ramp in Forsyth County, North Carolina. It was built in 1989, so it is 36 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49,250 vehicles a day, roughly 16% of them trucks, projected to reach 98,500 by 2040. The structure is 146 ft (44.5 m) long and 51 ft wide.

CarriesI40 Wbl
CrossesI74 Ebl US311 Sbl Ramp
Location1.54 Mi. E. Jct. SR4325
RouteInterstate 40
Coordinates36.06426, -80.18808
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating44 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length146 ft (44.5 m)
Longest span70 ft (21.3 m)
Deck width51 ft (15.4 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49,250 (2022)
Projected traffic98,500 by 2040
Trucks16%
Lanes on structure3
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I40 Wbl over I74 Ebl US311 Sbl Ramp built?

It was built in 1989, making it 36 years old in 2025.

What condition is I40 Wbl over I74 Ebl US311 Sbl Ramp in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does I40 Wbl over I74 Ebl US311 Sbl Ramp carry?

About 49,250 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is I40 Wbl over I74 Ebl US311 Sbl Ramp?

The structure is 146 ft (44.5 m) long with a longest span of 70 ft (21.3 m) and a deck 51 ft wide.

Who owns I40 Wbl over I74 Ebl US311 Sbl Ramp?

It is owned by the State Highway Agency.