US52 Sbl over Southern Railway
GoodForsyth County, North Carolina · 0.3 Mi. N. Jct. SR1669 · Structure no. 000000000670302
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 405 ft
- 4 main spans
- Daily traffic
- 24,750
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
US52 Sbl over Southern Railway is a prestressed concrete stringer/multi-beam or girder carrying US52 Sbl over Southern Railway in Forsyth County, North Carolina. It was built in 2022, so it is 3 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 24,750 vehicles a day, roughly 12% of them trucks, projected to reach 49,500 by 2040. The structure is 405 ft (123.4 m) long and 49 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US52 Sbl over Southern Railway built?
It was built in 2022, making it 3 years old in 2025.
What condition is US52 Sbl over Southern Railway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does US52 Sbl over Southern Railway carry?
About 24,750 vehicles per day (2019 count), of which roughly 12% are trucks.
How long is US52 Sbl over Southern Railway?
The structure is 405 ft (123.4 m) long with a longest span of 105 ft (32 m) and a deck 49 ft wide.
Who owns US52 Sbl over Southern Railway?
It is owned by the State Highway Agency.