US Bridges

SR1675 over I85

FairPosted for load

Durham County, North Carolina · 0.7 Mi. N. Jct. SR1671 · Structure no. 000000000630195

Built
1955
70 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
180 ft
4 main spans
Daily traffic
2,400
2021 count
Owner
State
State Highway Agency

About this bridge

SR1675 over I85 is a steel stringer/multi-beam or girder carrying SR1675 over I85 in Durham County, North Carolina. It was built in 1955, so it is 70 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 2,400 vehicles a day, roughly 7% of them trucks, projected to reach 4,800 by 2040. The structure is 180 ft (54.8 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesSR1675
CrossesI85
Location0.7 Mi. N. Jct. SR1671
RouteState Highway 1675
Coordinates36.03199, -78.84139
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40.9 US tons
Inventory rating24.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 15
Structure length180 ft (54.8 m)
Longest span52 ft (15.8 m)
Deck width31 ft (9.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,400 (2021)
Projected traffic4,800 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR1675 over I85 built?

It was built in 1955, making it 70 years old in 2025.

What condition is SR1675 over I85 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does SR1675 over I85 carry?

About 2,400 vehicles per day (2021 count), of which roughly 7% are trucks.

How long is SR1675 over I85?

The structure is 180 ft (54.8 m) long with a longest span of 52 ft (15.8 m) and a deck 31 ft wide.

Who owns SR1675 over I85?

It is owned by the State Highway Agency.