US Bridges

SR2060 over I85

Good

Davidson County, North Carolina · 0.1 Mi. N. Jct. SR2084 · Structure no. 000000000570491

Built
1981
44 years old
Condition
Good
inspected March 2022
Type
Stringer/Multi-beam or Girder
Steel
Length
312 ft
4 main spans
Daily traffic
1,700
2019 count
Owner
State
State Highway Agency

About this bridge

SR2060 over I85 is a steel stringer/multi-beam or girder carrying SR2060 over I85 in Davidson County, North Carolina. It was built in 1981, so it is 44 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,700 vehicles a day, roughly 7% of them trucks, projected to reach 3,400 by 2040. The structure is 312 ft (95 m) long and 43 ft wide.

CarriesSR2060
CrossesI85
Location0.1 Mi. N. Jct. SR2084
RouteState Highway 2060
Coordinates35.85455, -80.09656
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating62.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4 (+2 approach)
Design loadHS 20 + Mod
Structure length312 ft (95 m)
Longest span121 ft (36.8 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,700 (2019)
Projected traffic3,400 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR2060 over I85 built?

It was built in 1981, making it 44 years old in 2025.

What condition is SR2060 over I85 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2022.

How much traffic does SR2060 over I85 carry?

About 1,700 vehicles per day (2019 count), of which roughly 7% are trucks.

How long is SR2060 over I85?

The structure is 312 ft (95 m) long with a longest span of 121 ft (36.8 m) and a deck 43 ft wide.

Who owns SR2060 over I85?

It is owned by the State Highway Agency.