US Bridges

SR1108 over Future I295

Good

Cumberland County, North Carolina · 0.1 MI W JCT SR1111 · Structure no. 000000000510450

Built
2024
1 years old
Condition
Good
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
208 ft
2 main spans
Daily traffic
—
Owner
State
State Highway Agency

About this bridge

SR1108 over Future I295 is a prestressed concrete continuous stringer/multi-beam or girder carrying SR1108 over Future I295 in Cumberland County, North Carolina. It was built in 2024, so it is 1 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

No traffic count is recorded. The structure is 208 ft (63.3 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR1108
CrossesFuture I295
Location0.1 MI W JCT SR1111
RouteState Highway 1108
Coordinates34.98182, -79.04345
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation9: Superior to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating63.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length208 ft (63.3 m)
Longest span101 ft (30.7 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesOther
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR1108 over Future I295 built?

It was built in 2024, making it 1 years old in 2025.

What condition is SR1108 over Future I295 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does SR1108 over Future I295 carry?

No traffic count is recorded for this structure.

How long is SR1108 over Future I295?

The structure is 208 ft (63.3 m) long with a longest span of 101 ft (30.7 m) and a deck 43 ft wide.

Who owns SR1108 over Future I295?

It is owned by the State Highway Agency.