US Bridges

I95 Sbl over I95 Loop Nbl & SR2284

Good

Cumberland County, North Carolina · 1.1 MI.S.JCT.NC59 · Structure no. 000000000510030

Built
1980
45 years old
Condition
Good
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
406 ft
4 main spans
Daily traffic
20,000
2019 count
Owner
State
State Highway Agency

About this bridge

I95 Sbl over I95 Loop Nbl & SR2284 is a steel stringer/multi-beam or girder carrying I95 Sbl over I95 Loop Nbl & SR2284 in Cumberland County, North Carolina. It was built in 1980, so it is 45 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 20,000 vehicles a day, roughly 16% of them trucks, projected to reach 40,000 by 2040. The structure is 406 ft (123.7 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI95 Sbl
CrossesI95 Loop Nbl & SR2284
Location1.1 MI.S.JCT.NC59
RouteInterstate 95
Coordinates34.93141, -78.93833
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.9 US tons
Inventory rating54.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length406 ft (123.7 m)
Longest span146 ft (44.5 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,000 (2019)
Projected traffic40,000 by 2040
Trucks16%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I95 Sbl over I95 Loop Nbl & SR2284 built?

It was built in 1980, making it 45 years old in 2025.

What condition is I95 Sbl over I95 Loop Nbl & SR2284 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does I95 Sbl over I95 Loop Nbl & SR2284 carry?

About 20,000 vehicles per day (2019 count), of which roughly 16% are trucks.

How long is I95 Sbl over I95 Loop Nbl & SR2284?

The structure is 406 ft (123.7 m) long with a longest span of 146 ft (44.5 m) and a deck 43 ft wide.

Who owns I95 Sbl over I95 Loop Nbl & SR2284?

It is owned by the State Highway Agency.