US74/US76E over Livingston Creek
FairColumbus County, North Carolina · 0.2MI.W. of JCT.SR1824 · Structure no. 000000000470083
- Built
- 1922
- 103 years old, rebuilt 1941
- Condition
- Fair
- inspected July 2024
- Type
- Tee Beam
- Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 8,500
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
US74/US76E over Livingston Creek is a concrete tee beam carrying US74/US76E over Livingston Creek in Columbus County, North Carolina. It was built in 1922 and reconstructed in 1941, so it is 103 years old, older than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,500 vehicles a day, roughly 14% of them trucks, projected to reach 17,000 by 2040. The structure is 120 ft (36.5 m) long and 36 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US74/US76E over Livingston Creek built?
It was built in 1922, making it 103 years old in 2025. It was reconstructed in 1941.
What condition is US74/US76E over Livingston Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does US74/US76E over Livingston Creek carry?
About 8,500 vehicles per day (2022 count), of which roughly 14% are trucks.
How long is US74/US76E over Livingston Creek?
The structure is 120 ft (36.5 m) long with a longest span of 39 ft (11.8 m) and a deck 36 ft wide.
Who owns US74/US76E over Livingston Creek?
It is owned by the State Highway Agency.