US Bridges

SR2283 over I85 US29

Good

Cleveland County, North Carolina · 0.5 Mi. S. Jct. SR2305 · Structure no. 000000000450068

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
183 ft
2 main spans
Daily traffic
2,500
2016 count
Owner
State
State Highway Agency

About this bridge

SR2283 over I85 US29 is a prestressed concrete continuous stringer/multi-beam or girder carrying SR2283 over I85 US29 in Cleveland County, North Carolina. It was built in 2023, so it is 2 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,500 vehicles a day, roughly 7% of them trucks, projected to reach 5,000 by 2040. The structure is 183 ft (55.7 m) long and 43 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesSR2283
CrossesI85 US29
Location0.5 Mi. S. Jct. SR2305
RouteState Highway 2283
Coordinates35.19981, -81.36949
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98 US tons
Inventory rating58 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length183 ft (55.7 m)
Longest span89 ft (27.1 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,500 (2016)
Projected traffic5,000 by 2040
Trucks7%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR2283 over I85 US29 built?

It was built in 2023, making it 2 years old in 2025.

What condition is SR2283 over I85 US29 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR2283 over I85 US29 carry?

About 2,500 vehicles per day (2016 count), of which roughly 7% are trucks.

How long is SR2283 over I85 US29?

The structure is 183 ft (55.7 m) long with a longest span of 89 ft (27.1 m) and a deck 43 ft wide.

Who owns SR2283 over I85 US29?

It is owned by the State Highway Agency.