US64 over Southern Railway
GoodChatham County, North Carolina · 0.4 Mi. W. Jct. SR2113 · Structure no. 000000000370011
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 190 ft
- 3 main spans
- Daily traffic
- 11,500
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
US64 over Southern Railway is a prestressed concrete continuous stringer/multi-beam or girder carrying US64 over Southern Railway in Chatham County, North Carolina. It was built in 2002, so it is 23 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,500 vehicles a day, roughly 12% of them trucks, projected to reach 23,000 by 2040. The structure is 190 ft (57.9 m) long and 83 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US64 over Southern Railway built?
It was built in 2002, making it 23 years old in 2025.
What condition is US64 over Southern Railway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does US64 over Southern Railway carry?
About 11,500 vehicles per day (2021 count), of which roughly 12% are trucks.
How long is US64 over Southern Railway?
The structure is 190 ft (57.9 m) long with a longest span of 74 ft (22.5 m) and a deck 83 ft wide.
Who owns US64 over Southern Railway?
It is owned by the State Highway Agency.