Wilson Creek Dr. over Ut to Sweeten Creek
FairPosted for loadBuncombe County, North Carolina · .01MI.W.JCT.CARIBOU Rd. · Structure no. 000000000210842
- Built
- 1996
- 29 years old
- Condition
- Fair
- inspected June 2024
- Type
- Channel Beam
- Prestressed Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 2,500
- 1999 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Wilson Creek Dr. over Ut to Sweeten Creek is a prestressed concrete channel beam carrying Wilson Creek Dr. over Ut to Sweeten Creek in Buncombe County, North Carolina. It was built in 1996, so it is 29 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,500 vehicles a day, roughly 7% of them trucks, projected to reach 5,000 by 2040. The structure is 26 ft (7.9 m) long and 28 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wilson Creek Dr. over Ut to Sweeten Creek built?
It was built in 1996, making it 29 years old in 2025.
What condition is Wilson Creek Dr. over Ut to Sweeten Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does Wilson Creek Dr. over Ut to Sweeten Creek carry?
About 2,500 vehicles per day (1999 count), of which roughly 7% are trucks.
How long is Wilson Creek Dr. over Ut to Sweeten Creek?
The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 28 ft wide.
Who owns Wilson Creek Dr. over Ut to Sweeten Creek?
It is owned by the City or Municipal Highway Agency.