US Bridges

SR2531 over Southern RR

Fair

Buncombe County, North Carolina · .1 MI.S.JCT.I40 · Structure no. 000000000210751

Built
1980
45 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
157 ft
3 main spans
Daily traffic
1,200
2022 count
Owner
State
State Highway Agency

About this bridge

SR2531 over Southern RR is a steel continuous stringer/multi-beam or girder carrying SR2531 over Southern RR in Buncombe County, North Carolina. It was built in 1980, so it is 45 years old, older than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,200 vehicles a day, roughly 7% of them trucks, projected to reach 2,400 by 2040. The structure is 157 ft (47.8 m) long and 70 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesSR2531
CrossesSouthern RR
Location.1 MI.S.JCT.I40
RouteState Highway 2531
Coordinates35.61814, -82.28705
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.9 US tons
Inventory rating46 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length157 ft (47.8 m)
Longest span52 ft (15.8 m)
Deck width70 ft (21.3 m)
Roadway width67 ft (20.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,200 (2022)
Projected traffic2,400 by 2040
Trucks7%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR2531 over Southern RR built?

It was built in 1980, making it 45 years old in 2025.

What condition is SR2531 over Southern RR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does SR2531 over Southern RR carry?

About 1,200 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is SR2531 over Southern RR?

The structure is 157 ft (47.8 m) long with a longest span of 52 ft (15.8 m) and a deck 70 ft wide.

Who owns SR2531 over Southern RR?

It is owned by the State Highway Agency.