US Bridges

NC63 over Dix Creek

Good

Buncombe County, North Carolina · .3 MI.E.JCT.SR1305 · Structure no. 000000000210060

Built
2020
5 years old
Condition
Good
inspected September 2024
Type
Culvert
Concrete Continuous
Length
23 ft
2 main spans
Daily traffic
16,000
2016 count
Owner
State
State Highway Agency

About this bridge

NC63 over Dix Creek is a concrete continuous culvert carrying NC63 over Dix Creek in Buncombe County, North Carolina. It was built in 2020, so it is 5 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 16,000 vehicles a day, roughly 12% of them trucks, projected to reach 32,000 by 2040. The structure is 23 ft (7 m) long. If it were closed, the detour would be 0.6 mi (1 km).

CarriesNC63
CrossesDix Creek
Location.3 MI.E.JCT.SR1305
RouteState Highway 63
Coordinates35.62411, -82.66054
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58 US tons
Inventory rating45 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHL 93
Structure length23 ft (7 m)
Longest span11 ft (3.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic16,000 (2016)
Projected traffic32,000 by 2040
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NC63 over Dix Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is NC63 over Dix Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does NC63 over Dix Creek carry?

About 16,000 vehicles per day (2016 count), of which roughly 12% are trucks.

How long is NC63 over Dix Creek?

The structure is 23 ft (7 m) long with a longest span of 11 ft (3.3 m).

Who owns NC63 over Dix Creek?

It is owned by the State Highway Agency.