US Bridges

NC53 over Colly Creek

Good

Bladen County, North Carolina · 0.6 Mi. E. of Jct. NC210 · Structure no. 000000000170043

Built
2002
23 years old
Condition
Good
inspected May 2024
Type
Slab
Prestressed Concrete
Length
170 ft
5 main spans
Daily traffic
350
2022 count
Owner
State
State Highway Agency

About this bridge

NC53 over Colly Creek is a prestressed concrete slab carrying NC53 over Colly Creek in Bladen County, North Carolina. It was built in 2002, so it is 23 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, roughly 7% of them trucks, projected to reach 700 by 2040. The structure is 170 ft (51.8 m) long and 33 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesNC53
CrossesColly Creek
Location0.6 Mi. E. of Jct. NC210
RouteState Highway 53
Coordinates34.46429, -78.257
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating59 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans5
Design loadHS 20 + Mod
Structure length170 ft (51.8 m)
Longest span39 ft (11.8 m)
Deck width33 ft (10 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2022)
Projected traffic700 by 2040
Trucks7%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NC53 over Colly Creek built?

It was built in 2002, making it 23 years old in 2025.

What condition is NC53 over Colly Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does NC53 over Colly Creek carry?

About 350 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is NC53 over Colly Creek?

The structure is 170 ft (51.8 m) long with a longest span of 39 ft (11.8 m) and a deck 33 ft wide.

Who owns NC53 over Colly Creek?

It is owned by the State Highway Agency.