SR1169 over Ut to Elk Creek
FairPosted for loadAlleghany County, North Carolina · 200 FT.S.JCT.SR1167 · Structure no. 000000000050058
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 43 ft
- 1 main span
- Daily traffic
- 20
- 1995 count
- Owner
- State
- State Highway Agency
About this bridge
SR1169 over Ut to Elk Creek is a steel stringer/multi-beam or girder carrying SR1169 over Ut to Elk Creek in Alleghany County, North Carolina. It was built in 1994, so it is 31 years old, younger than the North Carolina average of 38.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 20 vehicles a day, projected to reach 40 by 2040. The structure is 43 ft (13.1 m) long and 20 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR1169 over Ut to Elk Creek built?
It was built in 1994, making it 31 years old in 2025.
What condition is SR1169 over Ut to Elk Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does SR1169 over Ut to Elk Creek carry?
About 20 vehicles per day (1995 count).
How long is SR1169 over Ut to Elk Creek?
The structure is 43 ft (13.1 m) long with a longest span of 39 ft (11.8 m) and a deck 20 ft wide.
Who owns SR1169 over Ut to Elk Creek?
It is owned by the State Highway Agency.