US Bridges

Corrigidor ST over Mcadams Creek

Good

Alamance County, North Carolina · 0.2 MI N JCT SR1962 · Structure no. 000000000010438

Built
2019
6 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete Continuous
Length
24 ft
2 main spans
Daily traffic
1,000
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Corrigidor ST over Mcadams Creek is a concrete continuous culvert carrying Corrigidor ST over Mcadams Creek in Alamance County, North Carolina. It was built in 2019, so it is 6 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 6% of them trucks, projected to reach 2,000 by 2040. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 0.6 mi (1 km).

CarriesCorrigidor ST
CrossesMcadams Creek
Location0.2 MI N JCT SR1962
RouteCity Street 0
Coordinates36.08872, -79.28422
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.9 US tons
Inventory rating50.9 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans2
Design loadHL 93
Structure length24 ft (7.3 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2018)
Projected traffic2,000 by 2040
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Corrigidor ST over Mcadams Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Corrigidor ST over Mcadams Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Corrigidor ST over Mcadams Creek carry?

About 1,000 vehicles per day (2018 count), of which roughly 6% are trucks.

How long is Corrigidor ST over Mcadams Creek?

The structure is 24 ft (7.3 m) long with a longest span of 10 ft (3 m).

Who owns Corrigidor ST over Mcadams Creek?

It is owned by the City or Municipal Highway Agency.