US Bridges

Valley DR over Big Ditch 111

Good

Yellowstone County, Montana · Laurel-Valley DR · Structure no. M56069000+00201

Built
2008
17 years old
Condition
Good
inspected January 2025
Type
Tee Beam
Prestressed Concrete
Length
45 ft
1 main span
Daily traffic
937
2023 count
Owner
County
County Highway Agency

About this bridge

Valley DR over Big Ditch 111 is a prestressed concrete tee beam carrying Valley DR over Big Ditch 111 in Yellowstone County, Montana. It was built in 2008, so it is 17 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 937 vehicles a day, roughly 3% of them trucks, projected to reach 998 by 2043. The structure is 45 ft (13.7 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesValley DR
CrossesBig Ditch 111
LocationLaurel-Valley DR
RouteCity Street 56069
StateMontana
Coordinates45.68315, -108.77301
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating55 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length45 ft (13.7 m)
Longest span45 ft (13.7 m)
Deck width41 ft (12.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic937 (2023)
Projected traffic998 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$65,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Valley DR over Big Ditch 111 built?

It was built in 2008, making it 17 years old in 2025.

What condition is Valley DR over Big Ditch 111 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2025.

How much traffic does Valley DR over Big Ditch 111 carry?

About 937 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is Valley DR over Big Ditch 111?

The structure is 45 ft (13.7 m) long with a longest span of 45 ft (13.7 m) and a deck 41 ft wide.

Who owns Valley DR over Big Ditch 111?

It is owned by the County Highway Agency.