Foster RD over American Fork Creek 007
FairWheatland County, Montana · 5M SE Harlowton · Structure no. L54015008+00001
- Built
- 1982
- 43 years old
- Condition
- Fair
- inspected September 2024
- Type
- Channel Beam
- Prestressed Concrete
- Length
- 33 ft
- 1 main span
- Daily traffic
- 100
- 2025 count
- Owner
- County
- County Highway Agency
About this bridge
Foster RD over American Fork Creek 007 is a prestressed concrete channel beam carrying Foster RD over American Fork Creek 007 in Wheatland County, Montana. It was built in 1982, so it is 43 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 33 ft (10.1 m) long and 19 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Foster RD over American Fork Creek 007 built?
It was built in 1982, making it 43 years old in 2025.
What condition is Foster RD over American Fork Creek 007 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Foster RD over American Fork Creek 007 carry?
About 100 vehicles per day (2025 count), of which roughly 3% are trucks.
How long is Foster RD over American Fork Creek 007?
The structure is 33 ft (10.1 m) long with a longest span of 31 ft (9.4 m) and a deck 19 ft wide.
Who owns Foster RD over American Fork Creek 007?
It is owned by the County Highway Agency.