US 2 over Mooney Coulee
GoodValley County, Montana · 6M NW Glasgow · Structure no. 000000202405115
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected November 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 100 ft
- 1 main span
- Daily traffic
- 1,484
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
US 2 over Mooney Coulee is a prestressed concrete tee beam carrying US 2 over Mooney Coulee in Valley County, Montana. It was built in 2024, so it is 1 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,484 vehicles a day, roughly 10% of them trucks, projected to reach 1,558 by 2043. The structure is 100 ft (30.5 m) long and 43 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US 2 over Mooney Coulee built?
It was built in 2024, making it 1 years old in 2025.
What condition is US 2 over Mooney Coulee in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does US 2 over Mooney Coulee carry?
About 1,484 vehicles per day (2023 count), of which roughly 10% are trucks.
How long is US 2 over Mooney Coulee?
The structure is 100 ft (30.5 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.
Who owns US 2 over Mooney Coulee?
It is owned by the State Highway Agency.