US Bridges

W Lake RD over Muddy CR Diversion 045

Fair

Sheridan County, Montana · W Edge Medicine Lake · Structure no. L46406000+01001

Built
1970
55 years old
Condition
Fair
inspected December 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
84 ft
1 main span
Daily traffic
198
2023 count
Owner
County
County Highway Agency

About this bridge

W Lake RD over Muddy CR Diversion 045 is a prestressed concrete box beam or girders - multiple carrying W Lake RD over Muddy CR Diversion 045 in Sheridan County, Montana. It was built in 1970, so it is 55 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 198 vehicles a day, roughly 3% of them trucks, projected to reach 208 by 2043. The structure is 84 ft (25.6 m) long and 25 ft wide. If it were closed, the detour would be 16.8 mi (27 km).

CarriesW Lake RD
CrossesMuddy CR Diversion 045
LocationW Edge Medicine Lake
RouteCounty Highway 46406
StateMontana
Coordinates48.50167, -104.51056
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating51.9 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1 (+1 approach)
Design loadHS 20
Structure length84 ft (25.6 m)
Longest span53 ft (16.2 m)
Deck width25 ft (7.5 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic198 (2023)
Projected traffic208 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed16.8 mi (27 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was W Lake RD over Muddy CR Diversion 045 built?

It was built in 1970, making it 55 years old in 2025.

What condition is W Lake RD over Muddy CR Diversion 045 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does W Lake RD over Muddy CR Diversion 045 carry?

About 198 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is W Lake RD over Muddy CR Diversion 045?

The structure is 84 ft (25.6 m) long with a longest span of 53 ft (16.2 m) and a deck 25 ft wide.

Who owns W Lake RD over Muddy CR Diversion 045?

It is owned by the County Highway Agency.