US Bridges

Shippe Canyon RD over Otter Creek 037

Fair

Sheridan County, Montana · 11M S Plentywood · Structure no. L46404010+09001

Built
1987
38 years old
Condition
Fair
inspected February 2024
Type
Channel Beam
Prestressed Concrete
Length
30 ft
1 main span
Daily traffic
117
2023 count
Owner
County
County Highway Agency

About this bridge

Shippe Canyon RD over Otter Creek 037 is a prestressed concrete channel beam carrying Shippe Canyon RD over Otter Creek 037 in Sheridan County, Montana. It was built in 1987, so it is 38 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 117 vehicles a day, projected to reach 123 by 2043. The structure is 30 ft (9.1 m) long and 24 ft wide. If it were closed, the detour would be 13 mi (21 km).

CarriesShippe Canyon RD
CrossesOtter Creek 037
Location11M S Plentywood
RouteCounty Highway 46404
StateMontana
Coordinates48.62603, -104.58044
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating36 US tons

Structure

Structure typeChannel Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span29 ft (8.8 m)
Deck width24 ft (7.3 m)
Roadway width24 ft (7.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic117 (2023)
Projected traffic123 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed13 mi (21 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Shippe Canyon RD over Otter Creek 037 built?

It was built in 1987, making it 38 years old in 2025.

What condition is Shippe Canyon RD over Otter Creek 037 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Shippe Canyon RD over Otter Creek 037 carry?

About 117 vehicles per day (2023 count).

How long is Shippe Canyon RD over Otter Creek 037?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.8 m) and a deck 24 ft wide.

Who owns Shippe Canyon RD over Otter Creek 037?

It is owned by the County Highway Agency.