Shippe Canyon RD over Big Muddy Creek 032
FairSheridan County, Montana · 2M S Plentywood · Structure no. L46404001+04001
- Built
- 1970
- 55 years old
- Condition
- Fair
- inspected January 2024
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 117
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Shippe Canyon RD over Big Muddy Creek 032 is a prestressed concrete tee beam carrying Shippe Canyon RD over Big Muddy Creek 032 in Sheridan County, Montana. It was built in 1970, so it is 55 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 117 vehicles a day, projected to reach 123 by 2043. The structure is 62 ft (18.9 m) long and 24 ft wide. If it were closed, the detour would be 23 mi (37 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Shippe Canyon RD over Big Muddy Creek 032 built?
It was built in 1970, making it 55 years old in 2025.
What condition is Shippe Canyon RD over Big Muddy Creek 032 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.
How much traffic does Shippe Canyon RD over Big Muddy Creek 032 carry?
About 117 vehicles per day (2023 count).
How long is Shippe Canyon RD over Big Muddy Creek 032?
The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 24 ft wide.
Who owns Shippe Canyon RD over Big Muddy Creek 032?
It is owned by the County Highway Agency.