US Bridges

S 21 over Irrigation Canal

Fair

Pondera County, Montana · 1M S Conrad · Structure no. P00021002+06271

Built
1988
37 years old
Condition
Fair
inspected February 2025
Type
Tee Beam
Prestressed Concrete
Length
27 ft
1 main span
Daily traffic
706
2023 count
Owner
State
State Highway Agency

About this bridge

S 21 over Irrigation Canal is a prestressed concrete tee beam carrying S 21 over Irrigation Canal in Pondera County, Montana. It was built in 1988, so it is 37 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 706 vehicles a day, roughly 5% of them trucks, projected to reach 741 by 2043. The structure is 27 ft (8.3 m) long and 42 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesS 21
CrossesIrrigation Canal
Location1M S Conrad
RouteU.S. Route 21
StateMontana
Coordinates48.14947, -111.94446
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53 US tons
Inventory rating35.1 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length27 ft (8.3 m)
Longest span25 ft (7.6 m)
Deck width42 ft (12.8 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic706 (2023)
Projected traffic741 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S 21 over Irrigation Canal built?

It was built in 1988, making it 37 years old in 2025.

What condition is S 21 over Irrigation Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.

How much traffic does S 21 over Irrigation Canal carry?

About 706 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is S 21 over Irrigation Canal?

The structure is 27 ft (8.3 m) long with a longest span of 25 ft (7.6 m) and a deck 42 ft wide.

Who owns S 21 over Irrigation Canal?

It is owned by the State Highway Agency.