US Bridges

NF-581 over S Fork Musselshell 026

Good

Meagher County, Montana · Lennep · Structure no. L30086000+01001

Built
1987
38 years old
Condition
Good
inspected April 2024
Type
Tee Beam
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
100
2025 count
Owner
County
County Highway Agency

About this bridge

NF-581 over S Fork Musselshell 026 is a prestressed concrete tee beam carrying NF-581 over S Fork Musselshell 026 in Meagher County, Montana. It was built in 1987, so it is 38 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 3% of them trucks, projected to reach 100 by 2040. The structure is 62 ft (18.9 m) long and 26 ft wide. If it were closed, the detour would be 29.8 mi (48 km).

CarriesNF-581
CrossesS Fork Musselshell 026
LocationLennep
RouteCounty Highway 30120
StateMontana
Coordinates46.41319, -110.54369
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.1 US tons
Inventory rating30 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length62 ft (18.9 m)
Longest span60 ft (18.3 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2025)
Projected traffic100 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed29.8 mi (48 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NF-581 over S Fork Musselshell 026 built?

It was built in 1987, making it 38 years old in 2025.

What condition is NF-581 over S Fork Musselshell 026 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does NF-581 over S Fork Musselshell 026 carry?

About 100 vehicles per day (2025 count), of which roughly 3% are trucks.

How long is NF-581 over S Fork Musselshell 026?

The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 26 ft wide.

Who owns NF-581 over S Fork Musselshell 026?

It is owned by the County Highway Agency.