US Bridges

S 508 FH 62 over Pete Creek

Good

Lincoln County, Montana · 2M W Yaak · Structure no. S00508028+02001

Built
1989
36 years old
Condition
Good
inspected August 2024
Type
Tee Beam
Concrete Continuous
Length
73 ft
3 main spans
Daily traffic
274
2023 count
Owner
State
State Highway Agency

About this bridge

S 508 FH 62 over Pete Creek is a concrete continuous tee beam carrying S 508 FH 62 over Pete Creek in Lincoln County, Montana. It was built in 1989, so it is 36 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 274 vehicles a day, roughly 2% of them trucks, projected to reach 288 by 2043. The structure is 73 ft (22.3 m) long and 35 ft wide. If it were closed, the detour would be 80.2 mi (129 km).

CarriesS 508 FH 62
CrossesPete Creek
Location2M W Yaak
RouteState Highway 508
StateMontana
Coordinates48.83135, -115.76648
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating99 US tons
Inventory rating69 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20
Structure length73 ft (22.3 m)
Longest span48 ft (14.6 m)
Deck width35 ft (10.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic274 (2023)
Projected traffic288 by 2043
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed80.2 mi (129 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S 508 FH 62 over Pete Creek built?

It was built in 1989, making it 36 years old in 2025.

What condition is S 508 FH 62 over Pete Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does S 508 FH 62 over Pete Creek carry?

About 274 vehicles per day (2023 count), of which roughly 2% are trucks.

How long is S 508 FH 62 over Pete Creek?

The structure is 73 ft (22.3 m) long with a longest span of 48 ft (14.6 m) and a deck 35 ft wide.

Who owns S 508 FH 62 over Pete Creek?

It is owned by the State Highway Agency.