US Bridges

Sierra Road E over Prickly Pear Creek 077

Fair

Lewis and Clark County, Montana · 5M NE Helena · Structure no. L25104002+02001

Built
1998
27 years old
Condition
Fair
inspected August 2023
Type
Tee Beam
Prestressed Concrete
Length
72 ft
1 main span
Daily traffic
623
2023 count
Owner
County
County Highway Agency

About this bridge

Sierra Road E over Prickly Pear Creek 077 is a prestressed concrete tee beam carrying Sierra Road E over Prickly Pear Creek 077 in Lewis and Clark County, Montana. It was built in 1998, so it is 27 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 623 vehicles a day, roughly 1% of them trucks, projected to reach 660 by 2043. The structure is 72 ft (21.9 m) long and 26 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSierra Road E
CrossesPrickly Pear Creek 077
Location5M NE Helena
RouteCounty Highway 25104
StateMontana
Coordinates46.66076, -111.97547
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating36 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20
Structure length72 ft (21.9 m)
Longest span72 ft (21.9 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic623 (2023)
Projected traffic660 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sierra Road E over Prickly Pear Creek 077 built?

It was built in 1998, making it 27 years old in 2025.

What condition is Sierra Road E over Prickly Pear Creek 077 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Sierra Road E over Prickly Pear Creek 077 carry?

About 623 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Sierra Road E over Prickly Pear Creek 077?

The structure is 72 ft (21.9 m) long with a longest span of 72 ft (21.9 m) and a deck 26 ft wide.

Who owns Sierra Road E over Prickly Pear Creek 077?

It is owned by the County Highway Agency.