US Bridges

S 200 over Drainage

Fair

Garfield County, Montana · 6M E Jordan · Structure no. P00057219+08341

Built
2004
21 years old
Condition
Fair
inspected March 2023
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
462
2023 count
Owner
State
State Highway Agency

About this bridge

S 200 over Drainage is a concrete culvert carrying S 200 over Drainage in Garfield County, Montana. It was built in 2004, so it is 21 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 462 vehicles a day, roughly 10% of them trucks, projected to reach 485 by 2043. The structure is 25 ft (7.7 m) long. If it were closed, the detour would be 123.7 mi (199 km).

CarriesS 200
CrossesDrainage
Location6M E Jordan
RouteState Highway 200
StateMontana
Coordinates47.33067, -106.76614
Functional classRural Principal Arterial - Other

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87 US tons
Inventory rating67 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 25 or greater
Structure length25 ft (7.7 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic462 (2023)
Projected traffic485 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S 200 over Drainage built?

It was built in 2004, making it 21 years old in 2025.

What condition is S 200 over Drainage in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does S 200 over Drainage carry?

About 462 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is S 200 over Drainage?

The structure is 25 ft (7.7 m) long with a longest span of 12 ft (3.7 m).

Who owns S 200 over Drainage?

It is owned by the State Highway Agency.