US Bridges

NFSR over Lost Johnny Creek

Good

Flathead County, Montana · South Fork Flathead · Structure no. 011006000012243

Built
2009
16 years old
Condition
Good
inspected July 2024
Type
Tee Beam
Prestressed Concrete
Length
82 ft
1 main span
Daily traffic
40
2018 count
Owner
Federal
U.S. Forest Service

About this bridge

NFSR over Lost Johnny Creek is a prestressed concrete tee beam carrying NFSR over Lost Johnny Creek in Flathead County, Montana. It was built in 2009, so it is 16 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 40 vehicles a day, projected to reach 60 by 2045. The structure is 82 ft (25 m) long and 26 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNFSR
CrossesLost Johnny Creek
LocationSouth Fork Flathead
RouteFederal Lands Road 895
StateMontana
Coordinates48.30484, -113.96844
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating29.3 US tons
Inventory rating14.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length82 ft (25 m)
Longest span80 ft (24.4 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic40 (2018)
Projected traffic60 by 2045
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was NFSR over Lost Johnny Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is NFSR over Lost Johnny Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does NFSR over Lost Johnny Creek carry?

About 40 vehicles per day (2018 count).

How long is NFSR over Lost Johnny Creek?

The structure is 82 ft (25 m) long with a longest span of 80 ft (24.4 m) and a deck 26 ft wide.

Who owns NFSR over Lost Johnny Creek?

It is owned by the U.S. Forest Service.