US Bridges

S-81 over Wolf Creek

Good

Fergus County, Montana · Denton · Structure no. 000000202206208

Built
2022
3 years old
Condition
Good
inspected July 2024
Type
Box Beam or Girders - Multiple
Concrete
Length
116 ft
3 main spans
Daily traffic
371
2023 count
Owner
State
State Highway Agency

About this bridge

S-81 over Wolf Creek is a concrete box beam or girders - multiple carrying S-81 over Wolf Creek in Fergus County, Montana. It was built in 2022, so it is 3 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 371 vehicles a day, roughly 8% of them trucks, projected to reach 390 by 2043. The structure is 116 ft (35.3 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesS-81
CrossesWolf Creek
LocationDenton
RouteState Highway 81
StateMontana
Coordinates47.3202, -109.9655
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating55 US tons
Inventory rating42 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length116 ft (35.3 m)
Longest span112 ft (34 m)
Deck width35 ft (10.8 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic371 (2023)
Projected traffic390 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S-81 over Wolf Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is S-81 over Wolf Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does S-81 over Wolf Creek carry?

About 371 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is S-81 over Wolf Creek?

The structure is 116 ft (35.3 m) long with a longest span of 112 ft (34 m) and a deck 35 ft wide.

Who owns S-81 over Wolf Creek?

It is owned by the State Highway Agency.