Nickelson Road over Drainage Canal
FairYazoo County, Mississippi · Sec 17 T12N R 4W · Structure no. SA820000000A176
- Built
- 2024
- 1 years old
- Condition
- Fair
- inspected October 2024
- Type
- Channel Beam
- Concrete
- Length
- 31 ft
- 1 main span
- Daily traffic
- 20
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
Nickelson Road over Drainage Canal is a concrete channel beam carrying Nickelson Road over Drainage Canal in Yazoo County, Mississippi. It was built in 2024, so it is 1 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: new structure not yet open to traffic.
It carries about 20 vehicles a day, projected to reach 30 by 2043. The structure is 31 ft (9.4 m) long and 19 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nickelson Road over Drainage Canal built?
It was built in 2024, making it 1 years old in 2025.
What condition is Nickelson Road over Drainage Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Nickelson Road over Drainage Canal carry?
About 20 vehicles per day (2021 count).
How long is Nickelson Road over Drainage Canal?
The structure is 31 ft (9.4 m) long with a longest span of 31 ft (9.4 m) and a deck 19 ft wide.
Who owns Nickelson Road over Drainage Canal?
It is owned by the County Highway Agency.