US Bridges

Joe Wray RD over Town Creek Relief

Good

Winston County, Mississippi · Sec 26 T14N R13E B · Structure no. SA8000000000052

Built
1990
35 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
180 ft
4 main spans
Daily traffic
100
2020 count
Owner
County
County Highway Agency

About this bridge

Joe Wray RD over Town Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying Joe Wray RD over Town Creek Relief in Winston County, Mississippi. It was built in 1990, so it is 35 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 150 by 2040. The structure is 180 ft (54.9 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesJoe Wray RD
CrossesTown Creek Relief
LocationSec 26 T14N R13E B
RouteCounty Highway 280
Coordinates33.03972, -88.93831
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating68.5 US tons
Inventory rating41.4 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length180 ft (54.9 m)
Longest span60 ft (18.3 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2020)
Projected traffic150 by 2040
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Joe Wray RD over Town Creek Relief built?

It was built in 1990, making it 35 years old in 2025.

What condition is Joe Wray RD over Town Creek Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Joe Wray RD over Town Creek Relief carry?

About 100 vehicles per day (2020 count).

How long is Joe Wray RD over Town Creek Relief?

The structure is 180 ft (54.9 m) long with a longest span of 60 ft (18.3 m) and a deck 31 ft wide.

Who owns Joe Wray RD over Town Creek Relief?

It is owned by the County Highway Agency.