Macedonia Road over Buffalo River
GoodWilkinson County, Mississippi · Sec 24 T 2N R 1E B · Structure no. SA7900000000032
- Built
- 1976
- 49 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 120 ft
- 3 main spans
- Daily traffic
- 90
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Macedonia Road over Buffalo River is a prestressed concrete stringer/multi-beam or girder carrying Macedonia Road over Buffalo River in Wilkinson County, Mississippi. It was built in 1976, so it is 49 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 90 vehicles a day, roughly 8% of them trucks, projected to reach 100 by 2045. The structure is 120 ft (36.6 m) long and 29 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Macedonia Road over Buffalo River built?
It was built in 1976, making it 49 years old in 2025.
What condition is Macedonia Road over Buffalo River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Macedonia Road over Buffalo River carry?
About 90 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is Macedonia Road over Buffalo River?
The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 29 ft wide.
Who owns Macedonia Road over Buffalo River?
It is owned by the County Highway Agency.