CO RD 251 over Eastfork Bogue Creek
FairWebster County, Mississippi · Sec 30 T21N R 8E B · Structure no. SA7800000000100
- Built
- 1965
- 60 years old
- Condition
- Fair
- inspected March 2024
- Type
- Channel Beam
- Concrete
- Length
- 76 ft
- 4 main spans
- Daily traffic
- 90
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 251 over Eastfork Bogue Creek is a concrete channel beam carrying CO RD 251 over Eastfork Bogue Creek in Webster County, Mississippi. It was built in 1965, so it is 60 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 90 vehicles a day, roughly 25% of them trucks, projected to reach 135 by 2042. The structure is 76 ft (23.2 m) long and 25 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 251 over Eastfork Bogue Creek built?
It was built in 1965, making it 60 years old in 2025.
What condition is CO RD 251 over Eastfork Bogue Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does CO RD 251 over Eastfork Bogue Creek carry?
About 90 vehicles per day (2022 count), of which roughly 25% are trucks.
How long is CO RD 251 over Eastfork Bogue Creek?
The structure is 76 ft (23.2 m) long with a longest span of 19 ft (5.8 m) and a deck 25 ft wide.
Who owns CO RD 251 over Eastfork Bogue Creek?
It is owned by the County Highway Agency.