US Bridges

Glendale Road over Canal

Good

Washington County, Mississippi · Sec 25 T18N R 8W · Structure no. SA7600000000258

Built
2010
15 years old
Condition
Good
inspected February 2025
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
860
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

Glendale Road over Canal is a concrete culvert carrying Glendale Road over Canal in Washington County, Mississippi. It was built in 2010, so it is 15 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 860 vehicles a day, roughly 8% of them trucks, projected to reach 1,204 by 2043. The structure is 22 ft (6.7 m) long. If it were closed, the detour would be 5.6 mi (9 km).

CarriesGlendale Road
CrossesCanal
LocationSec 25 T18N R 8W
RouteCity Street 460
Coordinates33.39324, -90.99778
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating64.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic860 (2023)
Projected traffic1,204 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$740,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Glendale Road over Canal built?

It was built in 2010, making it 15 years old in 2025.

What condition is Glendale Road over Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2025.

How much traffic does Glendale Road over Canal carry?

About 860 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is Glendale Road over Canal?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m).

Who owns Glendale Road over Canal?

It is owned by the City or Municipal Highway Agency.