FAS 619 Tribbett over Bogue Phalia
FairPosted for loadWashington County, Mississippi · Sec 20 T18N R 6W B · Structure no. SA7600000000217
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 320 ft
- 5 main spans
- Daily traffic
- 570
- 2021 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 619 Tribbett over Bogue Phalia is a steel stringer/multi-beam or girder carrying FAS 619 Tribbett over Bogue Phalia in Washington County, Mississippi. It was built in 1958, so it is 67 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 570 vehicles a day, roughly 8% of them trucks, projected to reach 855 by 2041. The structure is 320 ft (97.6 m) long and 27 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 619 Tribbett over Bogue Phalia built?
It was built in 1958, making it 67 years old in 2025.
What condition is FAS 619 Tribbett over Bogue Phalia in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does FAS 619 Tribbett over Bogue Phalia carry?
About 570 vehicles per day (2021 count), of which roughly 8% are trucks.
How long is FAS 619 Tribbett over Bogue Phalia?
The structure is 320 ft (97.6 m) long with a longest span of 80 ft (24.4 m) and a deck 27 ft wide.
Who owns FAS 619 Tribbett over Bogue Phalia?
It is owned by the County Highway Agency.