FAS 626 Riverside over Silver Lake
FairWashington County, Mississippi · Sec 9 T15N R 8W B · Structure no. SA7600000000079
- Built
- 1962
- 63 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 160 ft
- 4 main spans
- Daily traffic
- 310
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
FAS 626 Riverside over Silver Lake is a prestressed concrete stringer/multi-beam or girder carrying FAS 626 Riverside over Silver Lake in Washington County, Mississippi. It was built in 1962, so it is 63 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 310 vehicles a day, roughly 8% of them trucks, projected to reach 434 by 2042. The structure is 160 ft (48.8 m) long and 25 ft wide. If it were closed, the detour would be 7.5 mi (12 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAS 626 Riverside over Silver Lake built?
It was built in 1962, making it 63 years old in 2025.
What condition is FAS 626 Riverside over Silver Lake in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does FAS 626 Riverside over Silver Lake carry?
About 310 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is FAS 626 Riverside over Silver Lake?
The structure is 160 ft (48.8 m) long with a longest span of 40 ft (12.2 m) and a deck 25 ft wide.
Who owns FAS 626 Riverside over Silver Lake?
It is owned by the County Highway Agency.