SR 438 over Bogue Phalia River
FairWashington County, Mississippi · 1.5 MI E US 61 · Structure no. 310043807601110
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 200 ft
- 2 main spans
- Daily traffic
- 520
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR 438 over Bogue Phalia River is a steel stringer/multi-beam or girder carrying SR 438 over Bogue Phalia River in Washington County, Mississippi. It was built in 1958, so it is 67 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 520 vehicles a day, roughly 11% of them trucks, projected to reach 520 by 2043. The structure is 200 ft (61 m) long and 31 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR 438 over Bogue Phalia River built?
It was built in 1958, making it 67 years old in 2025.
What condition is SR 438 over Bogue Phalia River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does SR 438 over Bogue Phalia River carry?
About 520 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is SR 438 over Bogue Phalia River?
The structure is 200 ft (61 m) long with a longest span of 40 ft (12.2 m) and a deck 31 ft wide.
Who owns SR 438 over Bogue Phalia River?
It is owned by the State Highway Agency.