Bovina Cutoff Road over Markham Creek
GoodWarren County, Mississippi · Sec 19 T15N R 5E B · Structure no. SA7500000000034
- Built
- 1983
- 42 years old
- Condition
- Good
- inspected April 2024
- Type
- Channel Beam
- Concrete
- Length
- 93 ft
- 3 main spans
- Daily traffic
- 130
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Bovina Cutoff Road over Markham Creek is a concrete channel beam carrying Bovina Cutoff Road over Markham Creek in Warren County, Mississippi. It was built in 1983, so it is 42 years old, older than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 130 vehicles a day, roughly 8% of them trucks, projected to reach 195 by 2044. The structure is 93 ft (28.3 m) long and 31 ft wide. If it were closed, the detour would be 21.1 mi (34 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bovina Cutoff Road over Markham Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is Bovina Cutoff Road over Markham Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Bovina Cutoff Road over Markham Creek carry?
About 130 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is Bovina Cutoff Road over Markham Creek?
The structure is 93 ft (28.3 m) long with a longest span of 31 ft (9.4 m) and a deck 31 ft wide.
Who owns Bovina Cutoff Road over Markham Creek?
It is owned by the County Highway Agency.