Steward Road over James Wolf Creek
FairPosted for loadTate County, Mississippi · Sec 28 T 5S R 5W · Structure no. SA6900000000054
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 158 ft
- 3 main spans
- Daily traffic
- 80
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Steward Road over James Wolf Creek is a steel stringer/multi-beam or girder carrying Steward Road over James Wolf Creek in Tate County, Mississippi. It was built in 1988, so it is 37 years old, younger than the Mississippi average of 38.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 80 vehicles a day, projected to reach 120 by 2040. The structure is 158 ft (48.2 m) long and 28 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Steward Road over James Wolf Creek built?
It was built in 1988, making it 37 years old in 2025.
What condition is Steward Road over James Wolf Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does Steward Road over James Wolf Creek carry?
About 80 vehicles per day (2020 count).
How long is Steward Road over James Wolf Creek?
The structure is 158 ft (48.2 m) long with a longest span of 78 ft (23.8 m) and a deck 28 ft wide.
Who owns Steward Road over James Wolf Creek?
It is owned by the County Highway Agency.