US Bridges

SR 540 over Relief

Good

Smith County, Mississippi · 2.9 MI W SR 35 · Structure no. 310054006500540

Built
1968
57 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
280 ft
7 main spans
Daily traffic
1,300
2023 count
Owner
State
State Highway Agency

About this bridge

SR 540 over Relief is a prestressed concrete stringer/multi-beam or girder carrying SR 540 over Relief in Smith County, Mississippi. It was built in 1968, so it is 57 years old, older than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,300 vehicles a day, roughly 11% of them trucks, projected to reach 1,300 by 2043. The structure is 280 ft (85.3 m) long and 34 ft wide. If it were closed, the detour would be 14.9 mi (24 km).

CarriesSR 540
CrossesRelief
Location2.9 MI W SR 35
RouteState Highway 540
Coordinates32.01602, -89.56768
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.1 US tons
Inventory rating42 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans7
Design loadHS 20
Structure length280 ft (85.3 m)
Longest span40 ft (12.2 m)
Deck width34 ft (10.4 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,300 (2023)
Projected traffic1,300 by 2043
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRelief for waterway
Detour if closed14.9 mi (24 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 540 over Relief built?

It was built in 1968, making it 57 years old in 2025.

What condition is SR 540 over Relief in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does SR 540 over Relief carry?

About 1,300 vehicles per day (2023 count), of which roughly 11% are trucks.

How long is SR 540 over Relief?

The structure is 280 ft (85.3 m) long with a longest span of 40 ft (12.2 m) and a deck 34 ft wide.

Who owns SR 540 over Relief?

It is owned by the State Highway Agency.