US Bridges

Heed Neely Rd. over Relief for Big Creek

Good

Simpson County, Mississippi · Sec 2 T 1N R 2E B · Structure no. SA6400000000003

Built
1996
29 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
200 ft
5 main spans
Daily traffic
60
2020 count
Owner
County
County Highway Agency

About this bridge

Heed Neely Rd. over Relief for Big Creek is a prestressed concrete stringer/multi-beam or girder carrying Heed Neely Rd. over Relief for Big Creek in Simpson County, Mississippi. It was built in 1996, so it is 29 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, roughly 8% of them trucks, projected to reach 90 by 2040. The structure is 200 ft (61 m) long and 31 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesHeed Neely Rd.
CrossesRelief for Big Creek
LocationSec 2 T 1N R 2E B
RouteCounty Highway 216
Coordinates31.95472, -90.05878
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating83.9 US tons
Inventory rating43.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20
Structure length200 ft (61 m)
Longest span40 ft (12.2 m)
Deck width31 ft (9.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2020)
Projected traffic90 by 2040
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Heed Neely Rd. over Relief for Big Creek built?

It was built in 1996, making it 29 years old in 2025.

What condition is Heed Neely Rd. over Relief for Big Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does Heed Neely Rd. over Relief for Big Creek carry?

About 60 vehicles per day (2020 count), of which roughly 8% are trucks.

How long is Heed Neely Rd. over Relief for Big Creek?

The structure is 200 ft (61 m) long with a longest span of 40 ft (12.2 m) and a deck 31 ft wide.

Who owns Heed Neely Rd. over Relief for Big Creek?

It is owned by the County Highway Agency.