US Bridges

Gaunt Road over Drainage Canal

Good

Sharkey County, Mississippi · Sec 31 T10N R 7W B · Structure no. SA6300000000066

Built
2001
24 years old
Condition
Good
inspected August 2023
Type
Channel Beam
Concrete
Length
155 ft
5 main spans
Daily traffic
50
2021 count
Owner
County
County Highway Agency

About this bridge

Gaunt Road over Drainage Canal is a concrete channel beam carrying Gaunt Road over Drainage Canal in Sharkey County, Mississippi. It was built in 2001, so it is 24 years old, younger than the Mississippi average of 38.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 8% of them trucks, projected to reach 70 by 2043. The structure is 155 ft (47.2 m) long and 32 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesGaunt Road
CrossesDrainage Canal
LocationSec 31 T10N R 7W B
RouteCounty Highway 1508
Coordinates32.66819, -90.95207
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating65.4 US tons
Inventory rating39.2 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans5
Design loadHS 20
Structure length155 ft (47.2 m)
Longest span31 ft (9.4 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2021)
Projected traffic70 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$951,000 (2023 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Gaunt Road over Drainage Canal built?

It was built in 2001, making it 24 years old in 2025.

What condition is Gaunt Road over Drainage Canal in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Gaunt Road over Drainage Canal carry?

About 50 vehicles per day (2021 count), of which roughly 8% are trucks.

How long is Gaunt Road over Drainage Canal?

The structure is 155 ft (47.2 m) long with a longest span of 31 ft (9.4 m) and a deck 32 ft wide.

Who owns Gaunt Road over Drainage Canal?

It is owned by the County Highway Agency.